← All updates
NewImproved

New: the Lock & Bridge Planner

Pick where you start and where you stop, and the Lock & Bridge Planner lays out every lock and bridge between them in order — when you reach each one, whether it will be open, how long you wait, and where sunset falls. It runs on your boat, your speed and your departure time, and it works on the phone. Bridge Clearance Check now knows the draws too: which ones must open for your air draft, and what it takes to get them opened.

The Lock & Bridge Planner on a phone: 39 nm along your route, 3 locks, 6 bridges, Illinois Waterway. From Joliet City Dock to Heritage Harbor Marina. 3 locks and 4 bridges on this run, 4 in daylight. Leave Mon 7:00 AM, arrive Mon 7:37 PM at 7.5 knots.
Tools → Lock & Bridge Planner. Joliet City Dock to Heritage Harbor Marina, leaving Monday at 7:00 AM.

The Lock & Bridge Planner

The chart: three lock steps down from 0 to -100 ft, Brandon Road 6 at 7:14 AM +74 min, Dresden Island 2 at 10:08 AM +108 min, Marseilles 6 at 3:03 PM, the sunrise line at 7:33 AM, the waits drawn as bars on each step.
Each lock is a step; the bar on it is the wait. The summary line above says the first hold and the arrival.

Tools → Lock & Bridge Planner. The run is your trip's next leg by default; tap Change to plan any two places. The map shows the run, the chart shows the locks as steps with the waits drawn on them, and the list under it names every gate with its time and its source. A gate that would hold you says so — Brandon Road 6 · 7:14 AM · +74 min — and the arrival at the top already includes it. A bridge that opens when you get there says nothing, which is the point. On a phone the three pictures sit one under the other: map, chart, list.

On a bigger screen

The chart on a desktop: Sun, Sep 13 — Joliet City Dock to Heritage Harbor Marina, leaving 10:27 PM at 7.5 kts. Three steps down with each lock's arrival, the dark tag and the wait — 10:41 PM after dark +74 min, 1:35 AM before sunrise +108 min, 6:30 AM before sunrise +262 min — and the whole run shaded as night.
The same run on a desktop, leaving at night: every step says after dark or before sunrise, and the shading says why.

A tablet or a desktop draws the chart wide, with each gate's out time under its arrival and the bridges named under the axis with their closed clearance and mile.

The map and the list

The run on the map, Joliet to Heritage Harbor, with the three locks marked along the Illinois River and the direction arrows on the route.

Every lock on the map in its state's colour — live queue, typical wait only, closed, no live data — and a tap opens its card. The list is the working surface on a phone: the row says the time, the wait and where the wait comes from; the card under it carries the chamber, the VHF channel, the day's hours and what the operating authority publishes.

A lock's row, and its card

Brandon Road Lock & Dam in the list: LIVE QUEUE, no tows queued, feed as of 6:44 PM CDT, ~74 min typical; 7:14 AM before sunrise, +74 min, out 8:28 AM. Its card below: downbound 34 ft, 600 x 110 ft chamber, VHF 14, opens Mon Sep 14 24 hours a day.

Brandon Road: no tows queued on the Corps feed, 74 minutes typical, in the chamber at 7:14 and out at 8:28. The card says the lift, the chamber, the channel to call and the hours the district publishes for that day.

The whole waterway

Whole waterway view: the Illinois Waterway's nine locks as a staircase from 0 to -160 ft, LaGrange, Peoria, Starved Rock, Marseilles, Dresden Island, with a closure ringed.

Whole waterway shows the ladder past your run — every lock on the river, a closure in force on the chosen day ringed — so you can see what is coming the day after.

Where the hours come from

A bridge card: your air draft 21.5 ft, 5.5 ft too tall to pass under it closed; opens on request on Mon, Sep 14; your ETA 7:04 AM. Hours: US Coast Guard — 33 CFR 117 bridge regimes (Central), read Sep 11 — times are Chicago local, the bridge's own clock.

We read the published hours from the people who run the gates: the Coast Guard's bridge regulations (33 CFR 117), the New York State Canal Corporation, Parks Canada, the St. Lawrence Seaway and eleven Corps of Engineers districts — 312 schedules in force, re-read every night, each shown with its source and the date we read it. 207 of the 279 movable bridges on the Loop answer. The Coast Guard's Local Notice to Mariners rides on top: a bridge under repair or a lock on a short week shows as a notice on its card, and where the notice states its hours plainly the planner holds you to them.

Bridge Clearance Check: the draws that must open for you

Bridge Clearance Check, the Illinois River stretch: Clears, limiting clearance 47.2 ft, 25.7 ft margin. Movable bridges on this stretch: Brandon Road Drawbridge opens before midnight, 17.7 ft closed, raised by Brandon Road Lock for each lockage; the Beardstown lift bridge opens on signal, with a Coast Guard notice through Sep 19, 2026 quoted in full.

Tools → Bridge Clearance Check. Under each stretch of your route it now lists the draws your air draft can't clear closed and what it takes to get them opened — on signal, on the hour, on four hours' notice — with the regulation's own words and the date we read it. A span too low for your boat that never opens is said as a span you cannot pass, not as a bridge to hail. The Lock & Bridge Planner reads the same rows, so a draw that holds you there is the same draw, with the same time, here.

The day card says who holds you

My Trip's day card and the morning briefing walk today's leg gate by gate at your own usual departure hour and say only what binds: "Northeast 14th Street Bridge, Pompano Beach opens at 9:15 AM; you reach it 9:05 AM — 10 min to wait." A bridge that opens only on notice tells you the deadline to call. Leg Departure Planner shows the shut hours as a band on the departure track and prices the hold into your arrival; Plan Around Your Dates counts a lock that eats the day as the day it eats.

Seasons, from the source

Seasonal Timing Planner, February, off season: Erie Canal closed — Closes Oct 14, 2026. The 2027 opening is not yet published (2026 opened May 15). New York State Canal Corporation, read Sep 10. Trent-Severn closed — Closes Oct 12, 2026, Parks Canada, read Sep 10.

Seasonal Timing Planner used to carry a sentence we typed two years ago. It now reads the canal's own published season, and when a season ends and the next isn't published, it says so. When an authority changes a gate's hours and your plan had you there, the Dates card, the day card and the briefing say it in one line — only when the answer changed, not when the paperwork did.

What it cannot do yet

A railroad bridge's card: NO ANSWER. Chicago, Rock Island & Pacific Railroad Bridge (vertical lift, Joliet), 9 ft closed, your 21.5 ft — 12.5 ft too tall to pass under it closed. The draw: we will not answer for it — the railroad publishes no opening for boats; the chart note is all there is.

Railroad lifts that publish no opening for boats stay unanswered, by name — we say that rather than guess. A few regulations are written in shapes we cannot hold yet; those bridges show the regulation's own words instead of a time.

Where to find it

The Tools page with the Lock & Bridge Planner tile ringed in amber.
Tools → Lock & Bridge Planner. Needs an active trip.

Tools → Lock & Bridge Planner, and Tools → Bridge Clearance Check. Both need an active trip: the plan runs on your boat's profile and your trip's route.